We have been working with M/S AL Huda Engineering as subcontractor for their Sewerage Project at industrial area.
We have AVN 1000 machine used to install concreate sleeve
ID 1000mm , OD1280 mm and then either re-jack it to install
700mm GRP concrete surround or to fix the VC in side the
concrete sleeve using the spiders.
In addition we carry out the rebuilding of the avn1000 equipments.
DOHA AND RAYYAN SEWARAGE , PS36 AREA SEW.CIVIL PROJECT454
We worked with MS lotus contracting and trading company in their
Sewerage project as microtunnelling sub contractor.
We finished their project by using AVN600 to install 30 "steel sleeve pipes and then fixed the clay pipes and grout the annular.
|